|
Fee Duration and Disclaimer
The following schedule is applicable for the 2012 Calendar
Year. Because the WCSC is a non-profit
organization, these fees are set at a level that covers the WCSC's
annual expenses and are periodically subject to change. Due
to State budgetary constraints, these
fees have been raised for 2012 and may continue
to be increased throughout the year. Please confirm all applicable fees before making out your
check.
Fee
Schedule
| # |
Item Description |
Fee |
| 1. |
On-lot Sewage Septic Permit
Applications per site: |
|
a. |
New Construction on a Single
System
Add $25 if
a subdivision is involved
Add
(another) $100
for a Visual Inspection for Planning (residual has a
residence) |
$ 730 $
755
$
855
|
|
b. |
Repair Existing System without
Testing |
$ 415 |
|
c. |
Repair Existing System with Testing |
$ 630 |
|
d. |
Holding Tank Installation |
$ 410 |
|
e. |
Prior Testing with Prior Design
Approval |
$ 410 |
|
f. |
Prior Testing without Prior Design
Approval |
$ 460 |
| 2. |
Connect to Existing On-Lot Sewage Septic
System |
$ 500 |
| 3. |
10 Acre Exemption Confirmation |
$ 500 |
| 4. |
Miscellaneous Testing and Inspections -
per/hour |
$ 60 |
| 5. |
Dye Testing - per/residence |
$ 155 |
| 6. |
Subdivision Planning Module Preparation |
$ 350 |
| 7. |
Visual Inspection |
$ 155 |
| 8. |
Deposit for Preplanning a Development in
lieu of Applications |
$ 900 |
| 9. |
Any Installed System Inspection |
$ 130 |
| 10. |
Any Installed System Inspection with
Lab Test |
$ 300 |
|