|
Fee Duration and Disclaimer
The following schedule is applicable for the 2009 Calendar
Year. Because the WCSC is a non-profit
organization, these fees are set at a level that covers the WCSC's
annual expenses and are periodically subject to change. These
fees have been raised substantially in 2009 and may continue
to be increased throughout the year because of the current
state budget crunch. Please confirm all applicable fees before making out your
check.
Fee
Schedule
| # |
Item Description |
Fee |
| 1. |
On-lot Sewage Septic Permit
Applications per site: |
|
a. |
New Construction on a Single
System
Add $25 if
a subdivision is involved
Add
(another) $50
for a Visual Inspection for Planning (residual has a
residence) |
$ 700 $
725
$
775
|
|
b. |
Repair Existing System without
Testing |
$ 450 |
|
c. |
Repair Existing System with Testing |
$ 600 |
|
d. |
Holding Tank Installation |
$ 400 |
|
e. |
Prior Testing with Prior Design
Approval |
$ 400 |
|
f. |
Prior Testing without Prior Design
Approval |
$ 450 |
| 2. |
Connect to Existing On-Lot Sewage Septic
System |
$ 500 |
| 3. |
10 Acre Exemption Confirmation |
$ 500 |
| 4. |
Miscellaneous Testing and Inspections -
per/hour |
$ 50 |
| 5. |
Dye Testing - per/residence |
$ 150 |
| 6. |
Subdivision Planning Module Preparation |
$ 300 |
| 7. |
Visual Inspection |
$ 150 |
| 8. |
Deposit for Preplanning a Development in
lieu of Applications |
$ 850 |
| 9. |
Any Installed System Inspection |
$ 125 |
| 10. |
Any Installed System Inspection with
Lab Test |
$ 300 |
|