Sewage Permits

 

 
Description
A Sewage Permit is required for new, repair and holding tank applications.  These  three scenarios are described further below.

New Applications

A New application is used when there is no existing on-lot sewage septic system on the property.

Repair Applications

A Repair application is used if your existing on-lot sewage system needs to be fixed or replaced.  

(Note: If you are replacing your existing system with a new system, it is still a repair application.  As defined above, new applications are only used when the lot has no current sewage system.)

Holding Tank Application

A Holding Tank application is used in two scenarios.  First, it is used when there is no other way to eliminate a malfunctioning system.  Secondly, it is used when the property is a qualifying commercial property and has 800 gallons water flow or less per day.

 


Qualifying Questions
If you answer "yes" to any of the following questions, you must get a sewage permit:

  1. Are you building a new residential or commercial building on a property where no current sewage septic system exists?

  2. Do you have an existing system that is malfunctioning and needs to be fixed or replaced?

  3. Do you have an existing system that is malfunctioning and the only way to fix it is a holding tank application?  And you have an 800 or less gallons/day water flow?

  4. Is your property a commercial property with 800 or less gallons/day water flow? And will you be using a holding tank application?


Instructions for Obtaining a Sewage Permit
Click here to view detailed instructions for obtaining a sewage permit.


Sample Application Form
Click here to see a sample sewage permit form - in pdf format.

(Note: This pdf document will be launched in a new window - you must have Adobe Acrobat Reader to view this file.  Click here to download a free copy of Adobe Acrobat Reader.)

 

Due to DEP regulations regarding this form, you will need to come into the WCSC office to fill it out and submit it.  However, you can expedite this process by printing the form out, reviewing it and having the required information available when you come into the WCSC office.

 


What You and Your Contractor Need to Know
According to DEP regulations, no design, system cost estimate, installation or repair can be made for a sewage septic system until a permit is issued.
  Click here to see additional details regarding this DEP regulation.

 

Contact Us
Phone: 724-223-0504

Fax:     724-223-0508

Email:  wcsc550@comcast.net

 


 

Office Hours
T-F: 8:30 AM to 4:00 PM

(Lunch from 12-1 PM)
 


 

Office Location
550 Washington Road

Washington, PA 15301

Our office is located in Room 2 of the South Strabane Township Building.

Click on the CONTACT menu option above for more detailed contact information, including directions (and a map) to office.