Surveyor Requirements

 

 
Property Documentation Requirements

The following documentation requirements must be followed by surveyors when working with property owners and the WCSC for sewage septic-related property surveys.

  1. Surveys must show every lot in the subdivision, including residual.

  2. Surveys must show the stamped copy of the surveyor's seal.

  3. Surveys must show all surface waters.

  4. Surveys must show lot lines and lot sizes of all lots in the subdivision.

  5. Surveys must show all existing and proposed right-of-ways.

  6. Surveys must show orientation to North.

  7. Non-building waivers:

  1. The developer can not use a non-building waiver if the lot even remotely resembles a future building lot - unless the lot is "Z-lined" onto an adjacent lot with an existing system or an approved perc site.

  2. The non-building waiver paragraph ( from DEP form 3800-FM-WSWM0349 ) must be on original and all copies of the survey.

  3. The non-building waiver paragraph must indicate the exact lot/lots to which it applies.

 

 

Contact Us
Phone: 724-223-0504

Fax:     724-223-0508

Email:  wcsc550@comcast.net

 


 

Office Hours
T-F: 8:30 AM to 4:00 PM

(Lunch from 12-1 PM)
 


 

Office Location
550 Washington Road

Washington, PA 15301

Our office is located in Room 2 of the South Strabane Township Building.

Click on the CONTACT menu option above for more detailed contact information, including directions (and a map) to office.